Project Description
Sustrina, M., Ramanayaka, C.D.D., and Goulding, J.S., (2018), Developing work breakdown structure matrix for managing offsite construction projects, Architectural Engineering and Design Management, Vol. 14, Iss. 4, pp 381-397. https://doi.org/10.1080/17452007.2018.1477728